Area B: Assembly of Props and Infill Beams for GF Slab Formwork
Area B: Assembly of Props and Infill Beams for GF Slab Formwork
Area C: Slab Formwork is ready.
Area B: Assembly of Slab Formwork
Backfill Outside Row 1
Date: 28 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
27102007
Shuttering Assembly on the corner between Row 2 and Row 3
Shuttering Assembly on Row 4
Date: 27 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
25102007
Area A: Between GL.E~G/1~3
Area A: Between A~D/1~6
Area C
Area A: Assembly of Props and Infill Beams for GF Slab Formwork
Date: 25 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
24102007
Row 7: After Cast
Area B
Area B
Area B
Date: 24 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
22102007
Concret Truck and Pump Truck Parked Outside the Fence
Concrete Pouring on Row 7
Concrete Pouring on Row 7
Backfill outside the Row 8
Date: 22 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
21102207
Row 5: Rebar erection is ongoing.
Row 7: After Concrete Cast
Row 1: Backfill is ongoing
Area B: In-fill Beams are being assembled.
Area A: Slab formworks are being assembled.
Area B Status
Date: 21 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
18102007
Vibrate Concrete after Pouring
Concrete Pouring at Retaining Wall Row 1
Area B: Current Status
Area C: Slab Formwork completed.
Transformer Area: Rebars Erection completed.
Area A: Current Status
Date: 18 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
17102007
Area C: Assembly of Slab Formwork
Ramp: Current Status
Retaining Wall Row 5 Cast
Date: 17 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
14102007
Concrete Pouring at Stair No.1
Concrete Pouring at Row 6
Concrete Pouring at Row 6
Building B: Current Status
Building A: Current Status
Area C: Current Status/ Assembly of Slab Formwork
Date: 14 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
11102007
Installation of Holder and Props for Slab Formwork around Columns
Transformer Area
Date: 11 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
10102007
Sleeves Installation on Retaining Wall
Sleeves Installation on Retaining Wall
Sleeves Installation on Retaining Wall
Date: 10 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
09102007
Installation of Inner Retaining Wall Shuttering
Installation of Holder and Props for Slab Formwork around Columns
Rebars erection at Transformer Area on GL.A~B/1~3
Installation of Holder and Props for Slab Formwork at Area C on GL.D~G/3~7
Rebars Erection at Transformer Area
Date: 09 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
08102007
Installation of Holder and Props for Slab Formwork at Area C on GL.D~G/3~7
Sleeves Installed in the Retaining Wall
Installation of Waterproof Protection Board
Rebars Bending of Retaining Wall
Outer Shuttering Installation at Row 6
Date: 08 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE
較新的文章
較舊的文章
首頁
訂閱:
文章 (Atom)
Blog
►
2008
(62)
►
04
(18)
►
03
(23)
►
02
(2)
►
01
(19)
▼
2007
(89)
►
12
(5)
►
11
(11)
▼
10
(19)
28102007
27102007
25102007
24102007
22102007
21102207
18102007
17102007
14102007
11102007
10102007
09102007
08102007
07102007
04102007
03102007
02102007
01102007
30092007
►
09
(19)
►
08
(16)
►
07
(19)
關於我自己
Phillip Chiang 蔣文中
檢視我的完整簡介