28102007

Area B: Assembly of Props and Infill Beams for GF Slab Formwork

Area B: Assembly of Props and Infill Beams for GF Slab Formwork
Area C: Slab Formwork is ready.
Area B: Assembly of Slab Formwork
Backfill Outside Row 1

Date: 28 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

27102007

Shuttering Assembly on the corner between Row 2 and Row 3

Shuttering Assembly on Row 4


Date: 27 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

25102007

Area A: Between GL.E~G/1~3

Area A: Between A~D/1~6


Area C

Area A: Assembly of Props and Infill Beams for GF Slab Formwork


Date: 25 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

24102007

Row 7: After Cast

Area B
Area B
Area B
Date: 24 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

22102007

Concret Truck and Pump Truck Parked Outside the Fence

Concrete Pouring on Row 7

Concrete Pouring on Row 7
Backfill outside the Row 8

Date: 22 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

21102207

Row 5: Rebar erection is ongoing.
Row 7: After Concrete Cast
Row 1: Backfill is ongoing

Area B: In-fill Beams are being assembled.

Area A: Slab formworks are being assembled.

Area B Status
Date: 21 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

18102007

Vibrate Concrete after Pouring
Concrete Pouring at Retaining Wall Row 1


Area B: Current Status

Area C: Slab Formwork completed.

Transformer Area: Rebars Erection completed.

Area A: Current Status


Date: 18 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

17102007

Area C: Assembly of Slab Formwork
Ramp: Current Status



Retaining Wall Row 5 Cast

Date: 17 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

14102007

Concrete Pouring at Stair No.1
Concrete Pouring at Row 6


Concrete Pouring at Row 6



Building B: Current Status



Building A: Current Status


Area C: Current Status/ Assembly of Slab Formwork

Date: 14 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

11102007

Installation of Holder and Props for Slab Formwork around Columns
Transformer Area


Date: 11 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

10102007

Sleeves Installation on Retaining Wall Sleeves Installation on Retaining Wall


Sleeves Installation on Retaining Wall



Date: 10 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

09102007

Installation of Inner Retaining Wall Shuttering

Installation of Holder and Props for Slab Formwork around Columns

Rebars erection at Transformer Area on GL.A~B/1~3

Installation of Holder and Props for Slab Formwork at Area C on GL.D~G/3~7


Rebars Erection at Transformer Area


Date: 09 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

08102007

Installation of Holder and Props for Slab Formwork at Area C on GL.D~G/3~7

Sleeves Installed in the Retaining Wall
Installation of Waterproof Protection Board

Rebars Bending of Retaining Wall


Outer Shuttering Installation at Row 6
Date: 08 October 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE