Area C: Plywood panels on B1F Slab are ongoing. Stair No.3 (at right bottom corner) is ready for pouring concrete. Girders at Area C is processing (beside Row 8 Retaining Wall)
Date: 10 July 2007 Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE
Concrete Poured at the Wall of Lift No.1Date: 15 July 2007 Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE