28012008

Building B: Current Status (Rebar Erection & One-side Wall Shuttering for Stair No.2, Service Lift and Cast Pillars)

Building A: Current Status (Stair No.1, Stair No.2 and Cast Pillars and Props of Floor Slab)
Date: 28 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

25012008

Building A: Assembly of Props for 1FL Slab

Building A: Assembly of One-side Wall Shuttering for Stair No.1

Building A: Erection of Rebars & Assembly of One-side Wall Shuttering at Stair No.2



Date: 25 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

24012008

Area B: Concrete Pouring


Building A: Assembly of One-side Wall Formwork for Stair No.2


Building B: Assembly of One-side Wall Formwork for Service Lift




Building B: Rebars Erection for Stair No.3 Wall



Date: 24 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

23012008

Building B: Rebars Erection for Stair No.4

Building B: Rebars Erection for the Wall of Passenger Lift No.3 & No.4
Building B: Rebars Erection for Stair No.3


Building A: Rebars Erection for Stair No.2


Building B: Assembly of Passenger Lift No.3 & No.4


Building A: Rebars Erection for the Wall of Stair No.1 Date: 23 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

22012008

Building B: Assembly of Pillar Formwork

Building B: Assembly of Pillar Formwork
Building B: Erection of Wall Rebars for Service Lift


Building A: Assembly of Wall Formwork for Passenger Lift No.1 & No.2



Date: 22 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

20012008

Building A: Current Status

Building A: Current Status


Building B: Current Status

Date: 20 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

19012008

Building B: Assembly of Column Formwork

Building B: Assembly of Column Formwork

Date: 19 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

17012008

Area A: Concrete Pouring for Columns

Area B (Ground Floor): Concrete Cast beside the Ramp on GL.F~K/North of GL.10

Area B (Ground Floor): Concrete Cast along GL.6~10/East of GL.K


Building A: Assemply of Column Formwork

Building A: Erection of Lift Wall Rebars

Building B: Erection of Column Rebars
Date: 17 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

16012008

Stressing for Strand of PT at Area B

Stressing for Strand of PT at Area B
Date: 16 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

13012008

Area B: Curing for the Cast Slab at Diagonal of GL.H~K/4~6
Area B: Curing for the Cast Slab at GL.6~10/outside the K


Date: 13 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

12012008

Area B: Under the Curing

Area A: Erection of Column Rebars and Assembly of Column Formwork

Area A: Second layer of Concrete Pouring at Diagonal of GL.1~3/E~G


Date: 12 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

10012008

Area B: Concrete Pouring

Area B: Concrete Pouring


Area B: Concrete Pouring

Date: 10 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

09012008

Area B: Concrete Pouring
Area B: Concrete Pouring

Area B: Concrete Pouring



Area B: Concrete Pouring


Area B: Concrete Pouring

Date: 09 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

08012008

Area A: Concrete Pouring at Diagonal of GL.3~6/D~F

Area A: First Layer of Concrete Pouring at Diagonal of GL.1~3/E~G


Area A: First Layer of Concrete Pouring at Diagonal of GL.1~3/E~G

Date: 08 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE

07012008

Area D: Concrete Pouging at the Outside the PT Area
Stair 1: Concret Pouring on GF landing

Area A: Concrete Pouring at GF Slab (Outside the Building)


Date: 07 January 2008
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospital Dubai Healthcare City, UAE