Building A: Current Status (Stair No.1, Stair No.2 and Cast Pillars and Props of Floor Slab)
28012008
Building B: Current Status (Rebar Erection & One-side Wall Shuttering for Stair No.2, Service Lift and Cast Pillars)

Building A: Current Status (Stair No.1, Stair No.2 and Cast Pillars and Props of Floor Slab)
Building A: Current Status (Stair No.1, Stair No.2 and Cast Pillars and Props of Floor Slab)
25012008
24012008
17012008
13012008
08012008