27092007

Formwork Assembly for Lift Shaft No.5

Ramp Wall Formwork Assembly

Rebars Erection for Row 8 Retaining Wall

Props Assembly on GL.E~G/4~6
Date: 27 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

24092007

Mr. Chao Visited Site.


Area B: Concrete Pouring for Column


Formwork for Lift Shaft No.3 & No.4

Waterproof on Row 1 Block Wall


Stair No.3: Rebars Erection for Wall


Stair No.1: Formwork for Steps & Rebars Erection for Wall


Bricklaying for Block Wall on Row3
Date: 24 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

20092007

Formwork Assembly for Slab on GL.A~B/1~3

Bricklaying for Block Wall on Row 1

Area D: Slab Curing
Date: 20 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

19092007

Bricklaying for Block Wall on Row 7

Lift Shaft Wall Formwork Assembly



Area B: Concrete Pouring in Column


Area B: Concrete Pouring in Column

Aea B: Concrete Pouring in Column


Date: 19 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

17092007

Remove Blocks to Row 1

DB3 Side Formwork Assemply




Date: 17 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

16092007

Area B: Rebar Erection


Area B: Columns Formwork Assembly

Ramp Wall Rebar Erection

Retaining Wall Rebar Erection for Row 6

Retaining Wall Rebar Erection for Row 3


Retaining Wall Rebar Erection for Row 8


Date: 16 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

15092007

Area A: Slab Formwork Assembly for Substation at Ground Floor

Area A: Wall Rebar Erection for Stair No.2
Area A: Rebar Erection for Lift Shaft



Area B: Rebar Erection for Lift Shaft

Date: 15 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

13092007

Area C: Concrete Casting in Columns

Area B: Concrete Casting in Column

Area B: Concrete Casting in Column
Area D: Concrete Pouring





Area D: Concrete Pouring

Date: 13 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

12092007


Area D: Concrete Pouring


Area D: Concrete Pouring

Rebar Erection on Row 8

Date: 12 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

11092007

Area B: Column Formwork are being assembled

Rebars Erection for Wall of Lift Shaft
Area D: Ready for Inspection by TECOM
Rebars erection on Row 3

Concrete Cast on Strip

Date: 11 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

10092007

Area D: Rebars Erection for Beam

Rebars Erection on Row 3 & Column Formwork dismantled

Area A: Columns Formwork Dismantled

Rebars Erection on Row 8

Date: 10 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

08092007

Concrete Pouring at Strip Beside Row 8

Concrete Pouring beside Row 8
Concrete Pouring at Strip between Area A and Area C

Concrete Pouring at Strip beside Row 8

Concrete Pouring at Strip beside Row 3

Concrete Pouring for Column ar Area A

Concrete Pouring for Column at Area A



Concrete Pouring for Column at Area A
Concrete Pouring for Column at Area A


Concrete Pouring for Column at Area A




Cleaning for Strip between Area A & Area C
Cleaning for Strip between Area A & Area C

Erection of Column Rebars between Area A & Area C


Date: 08 September 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE