08072007



B1F Slab Formwork cannot reach to the Retaining Wall at Row 1 because of lower whaler installed by the Dutch Foundation.



Assemply of Formwork for Stair No.2

Curing for Cover Floor of No.2 Lift Pit


Area B:

Removal of Column Formwork

Formwork Assembly of Lift No.3







Ramp: Erection of Rebars.
Date: 8 July 2007
Location: Urology, Nephrology, Diebetes & Diagnostic Imaging Hospial Dubai Healthcare City, UAE

沒有留言: